African Gold Group

Show printable version of 'Kobada' item in a New WindowEmail 'Kobada' item to a friend

"Majestic Trend"


click on image to view enlarged version


click on image to view enlarged version


African Gold Group announced it was entering Mali, West Africa, through the acquisition of three gold concessions on the 28th of June, 2005.

The acquisition included a body of reference material that comprises a historical data base derived from the expenditure of approximately €5,000,000 in exploration and development capital.

Kobada is located in the Kangaba region of Mali and measures 216 sq. km. This includes the Kobada, Foroko and Acoma concessions. To date most of the exploration work on Kobada has been confined to "Zone 1", a 1.2 km long gold in soil anomaly that represents a mere 10% of the entire 12 km, anomalous Kobada Trend.

AGG believes that the Kobada Trend may have multi-million oz Au potential. At this point, the whole of "Zone-1" has been infill drilled yielding favorable results: 81 Meters of 1.21 g/t Au, including 18 Meters of 2.26 g/t Au, and 48 Meters of 2.95 G/T Au including 19.20 Meters of 5.91 G/T Au.

In November of 2007, AGG initiated a 25,000 Meter RC drill campaign to test for Au mineralization over the remaining untested 11 kilometers of the Kobada Trend. The exploration potential remains open along strike and at depth.


The best intercepts are summarized in the following table:




AGG Kobada 2006-2007
The best intercepts on section(s)




The exploration results are listed below in the order that we received them. Click on the respective title to view each press release in its entirety:

October 11, 2007
African Gold Group, Inc: Drilling Extends Continuity Of Mineralized Strike Length To 1.35 Km At Kobada And Remains Open Along Strike

For coherence, the results from the 23 diamond drill holes have been organized according to the section the hole was drilled on as opposed to numerical order and are depicted in Table 1 below.

TABLE 1: RESULTS FROM AGG'S DIMAOND DRILLING CAMPAIGN
Signficant Intersections On Sections Drilled
Metallic Assays
Kobada Project, Mali


Section

Hole

Interval

Au (g/t)

From

To

Length

18+00S

KB07-60

259.80

289.50

29.70

1.09

 

incl

278.00

287.70

9.70

2.44

18+50S

KB07-76

277.00

285.50

8.50

1.01

 

 

290.00

298.20

8.20

0.69

 

incl

292.00

295.00

3.00

1.29

19+00S

KB07-64

231.00

234.50

3.50

0.79

 

KB07-68

No significant intersections

 

KB07-79

307.00

320.00

13.00

0.38

 

 

351.00

352.00

1.00

1.46

19+50S

KB07-93

109.00

121.00

12.00

0.26

 

 

201.30

205.30

4.00

0.76

23+50S

KB07-84

79.50

101.50

22.00

0.75

 

incl

80.40

83.10

2.70

2.04

 

and

88.50

92.50

4.00

1.82

24+50S

KB07-58*

79.70

100.50

20.80

0.74

 

incl

86.50

94.00

7.50

1.65

 

KB07-66

192.30

207.00

14.70

0.44

 

incl

192.30

197.00

4.70

0.92

 

KB07-75

123.00

148.60

25.60

0.36

 

incl

124.00

126.50

2.50

0.83

 

 

173.40

174.50

1.10

4.37

 

KB07-83

20.50

31.00

10.50

16.76

 

incl

22.00

23.50

1.50

94.34

 

and

28.00

29.00

1.00

32.19

 

 

54.10

56.70

2.60

1.94

25+50S

KB07-61*

11.00

23.50

12.50

0.34

 

 

53.50

87.50

34.00

0.51

 

incl

56.50

61.90

5.40

1.75

 

KB07-62

52.00

98.00

46.00

0.52

 

incl

80.00

88.00

8.00

1.48

 

and

92.00

98.00

6.00

1.13

 

KB07-63

169.50

189.00

19.50

0.37

 

 

208.00

211.00

3.00

1.03

26+00S

KB07-77

8.50

13.00

4.50

2.75

 

incl

10.00

13.00

3.00

3.99

 

 

77.50

83.50

6.00

1.02

 

incl

79.00

81.00

2.00

2.79

 

 

96.30

99.30

3.00

1.19

 

 

109.00

126.20

17.20

0.50

 

 

143.50

154.00

10.50

0.46

 

incl

147.00

150.70

3.70

0.97

 

 

162.50

168.50

6.00

1.01

 

KB07-80

2.50

28.00

25.50

0.32

 

 

65.50

72.00

6.50

0.78

 

incl

67.30

72.00

4.70

0.98

 

KB07-94

134.10

140.00

5.90

0.82

 

incl

137.60

139.00

1.40

2.70

 

 

252.00

256.60

4.60

1.01

 

incl

253.50

256.60

3.10

1.33

26+50S

KB07-78

85.50

141.50

56.00

1.29

 

incl

116.00

117.10

1.10

45.03

 

and

139.40

141.50

2.10

2.16

 

 

215.50

222.00

6.50

1.16

 

incl

215.50

218.50

3.00

1.70

 

KB07-81

0.00

60.00

60.00

0.60

 

incl

29.50

33.60

4.10

1.97

 

and

42.00

47.70

5.70

1.25

 

 

65.50

95.50

30.00

0.22

 

 

136.70

139.40

2.70

1.55

 

 

146.50

155.00

8.50

0.82

 

incl

148.00

148.35

0.35

14.92

 

KB07-82

35.90

58.50

22.60

1.11

 

incl

41.50

45.50

4.00

4.18

 

 

94.00

141.00

47.00

0.32

 

incl

96.50

99.50

3.00

1.00

 

KB07-95

114.50

122.00

7.50

1.12

 

incl

114.50

122.00

7.50

1.12

 

 

169.00

179.90

10.90

3.54

 

incl

170.00

171.50

1.50

19.01

 

and

175.50

179.90

4.40

2.11

 

 

195.00

223.80

28.80

0.45

 

incl

214.60

218.10

3.50

1.51

 

 

227.60

251.80

24.20

0.35

27+00S
KB07-96
161.00
199.20
38.20
0.38
 
 
215.10
234.00
18.90
0.30
 
 
237.00
261.00
24.00
0.38
 
incl
243.50
245.40
1.90
2.38
 
KB07-97
44.50
55.00
10.50
0.47
 
 
94.00
147.00
53.00
0.60
 
incl
106.80
108.00
1.20
9.83
28+00S
KB07-98
113.00
124.00
11.00
0.39
29+00S
KB07-99
67.00
88.00
21.00
0.40
 
incl
68.50
71.50
3.00
1.20

* KB07-58 & KB07-61 represent fire assay results only.

July 10, 2007
African Gold Group, Inc: Kb07-73 Intersects 38.20 Meters Of 1.93 G/T Au, Including 6.5 Meters Of 9.39 G/T Au At Kobada, Mali

For coherence, the results from the nine diamond drill holes have been organized according to the section the hole was drilled on as opposed to numerical order and are depicted in Table 1 below.

TABLE 1: RESULTS FROM AGG'S DIAMOND DRILLING CAMPAIGN

Significant Intersections On Sections Drilled

Metallics Assays

 

 

 

Kobada Project, Mali

 

 

 

 

 

 

 

 

 

Section

Hole

Interval

Au (g/t)

From

To

Length

20+00S

KB07-71

89.50

93.50

4.00

0.27

20+50S

KB07-74

130.00

138.50

8.50

1.51

 

 

143.50

151.00

7.50

0.86

 

incl

143.50

149.50

6.00

1.03

21+50S

KB07-70

7.00

24.80

17.80

0.69

 

incl

16.00

21.00

5.00

1.48

 

 

30.80

57.70

26.90

0.35

 

incl

30.80

35.00

4.20

1.11

 

 

64.20

88.00

23.80

1.82

 

incl

71.50

83.50

12.00

3.26

 

KB07-72

35.50

50.00

14.50

0.57

 

incl

37.00

40.00

3.00

1.49

 

 

118.50

137.50

19.00

1.14

 

incl

118.50

121.00

2.50

4.88

 

and

128.50

131.50

3.00

2.31

22+50S

KB07-67

182.00

193.50

11.50

0.25

 

 

198.50

280.00

81.50

0.96

 

incl

226.00

278.70

52.70

1.29

 

KB07-69

70.50

82.00

11.50

1.32

 

 

88.00

127.00

39.00

0.48

24+50S

KB07-65

103.50

114.90

11.40

0.44

 

 

120.00

127.00

7.00

0.46

25+00S

KB07-73

78.80

117.00

38.20

1.93

 

incl

92.50

99.00

6.50

9.39

 

incl

94.00

96.00

2.00

28.04

 

and

106.70

112.00

5.30

1.12

 

 

145.50

162.50

17.00

0.71

 

incl

145.50

152.60

7.10

1.28

25+50S

KB07-59

14.50

25.00

10.50

0.31



May 30, 2007
African Gold Group, Inc: 33 New Drill Holes Advance Kobada Potential To Southwest Within "Zone 1"

For coherence, the results from the 33 diamond drill holes have been organized according to the section the hole was drilled on as opposed to numerical order and are depicted in Table 1 below.

TABLE 1: RESULTS FROM AGG'S DIAMOND DRILLING CAMPAIGN

Section

Hole

Interval

Au (g/t)

From

To

Length

15+50S

KB07-14

71.50

74.50

3.00

2.54

 

 

182.00

185.00

3.00

2.63

 

 

192.00

228.00

36.00

0.45

17+00S

KB07-41

249.80

267.50

17.70

0.90

17+50S

KB07-53

176.40

182.00

5.60

0.69

 

 

227.50

238.20

10.70

0.80

 

incl

230.50

234.50

4.00

1.66

 

 

242.80

251.50

8.70

1.38

 

incl

243.50

249.60

6.10

1.85

 

 

261.00

296.00

35.00

1.27

 

incl

262.00

269.00

7.00

2.53

 

and

287.60

296.00

8.40

1.99

18+00S

KB07-50

141.00

163.50

22.50

0.73

 

 

175.50

186.00

10.50

1.98

 

 

192.00

210.00

18.00

0.47

 

incl

204.70

208.50

3.80

1.04

 

 

234.00

249.00

15.00

0.50

18+50S

KB07-30

0.00

8.50

8.50

0.91

 

incl

2.50

7.50

5.00

1.21

 

 

40.00

44.50

4.50

1.18

 

KB07-45

114.00

126.00

12.00

0.91

 

incl

118.50

121.50

3.00

1.24

 

 

215.00

234.60

19.60

0.75

 

incl

220.00

225.00

5.00

1.46

 

 

245.00

250.00

5.00

1.02

 

incl

246.00

250.00

4.00

1.16

19+00S

KB07-29

0.00

7.00

7.00

0.83

 

 

37.00

56.50

19.50

0.76

 

incl

37.00

40.00

3.00

2.10

 

and

50.50

56.50

6.00

1.21

 

KB07-47

166.00

177.70

11.70

3.78

 

incl

167.50

172.00

4.50

9.57

19+50S

KB07-26

97.00

116.50

19.50

0.72

 

incl

108.80

116.50

7.70

1.33

 

 

122.50

147.00

24.50

0.95

 

incl

122.50

133.50

11.00

1.80

 

KB07-27

25.00

55.30

30.30

0.57

 

incl

34.00

48.50

14.50

0.78

 

 

61.00

91.00

30.00

0.50

 

incl

88.00

91.00

3.00

1.55

 

 

125.50

136.00

10.50

0.47

 

incl

128.50

134.50

6.00

0.72

20+00S

KB07-28

97.00

131.50

34.50

0.29

 

 

137.70

163.00

25.30

0.60

 

incl

151.00

155.00

4.00

1.37

 

 

209.00

218.00

9.00

1.29

 

incl

211.80

217.00

5.20

2.05

20+50S

KB07-31

67.00

80.50

13.50

0.38

 

 

115.00

118.50

3.50

1.56

 

KB07-32

212.50

250.00

37.50

0.69

 

incl

217.50

236.80

19.30

1.00

 

KB07-33

220.00

299.00

79.00

0.58

 

incl

236.00

239.00

3.00

2.04

 

and

263.00

278.00

15.00

0.95

 

and

284.70

293.00

8.30

1.19

 

 

309.00

316.00

7.00

1.47

 

KB07-39

276.50

292.50

16.00

0.53

 

 

347.50

355.00

7.50

0.83

 

KB07-56

132.20

142.00

9.80

0.25

21+00S

KB07-34

197.00

237.00

40.00

0.57

 

incl

223.00

226.00

3.00

1.37

 

and

229.00

233.40

4.40

2.13

 

 

243.00

262.00

19.00

0.56

 

KB07-35

143.50

194.00

50.50

0.73

 

incl

164.00

165.00

1.00

19.35

 

and

180.00

184.00

4.00

1.48

21+50S

KB07-36

183.00

241.00

58.00

0.60

 

incl

202.00

206.10

4.10

2.44

 

and

210.00

213.00

3.00

1.48

 

and

216.00

229.00

13.00

0.86

 

KB07-37

110.50

117.00

6.50

1.01

 

incl

113.00

116.00

3.00

1.84

 

 

167.00

200.00

33.00

0.55

 

incl

180.00

190.00

10.00

1.00

22+00S

KB07-38

0.00

2.50

2.50

6.57

 

 

161.50

195.00

33.50

0.62

 

incl

166.00

187.10

21.10

0.76

 

KB07-40

0.00

5.50

5.50

1.98

 

 

204.00

244.00

40.00

0.76

 

incl

211.00

222.00

11.00

1.29

 

and

239.00

244.00

5.00

1.31

22+50S

KB07-42

159.00

201.00

42.00

1.05

 

incl

169.00

194.50

25.50

1.55

 

KB07-43

114.00

149.00

35.00

0.67

 

incl

130.00

140.00

10.00

0.93

23+00S

KB07-44

153.30

178.00

24.70

0.40

 

 

184.00

201.00

17.00

1.55

 

incl

184.00

193.00

9.00

1.57

 

and

197.00

201.00

4.00

2.93

 

 

207.00

216.20

9.20

1.28

 

KB07-46

224.00

235.50

11.50

0.39

 

 

243.60

260.50

16.90

0.38

 

incl

245.80

249.30

3.50

1.12

23+50S

KB07-48

118.00

135.00

17.00

0.68

 

incl

118.00

129.70

11.70

0.87

 

 

145.00

155.50

10.50

0.65

 

KB07-49

161.00

205.00

44.00

0.75

 

incl

170.00

180.00

10.00

1.66

 

KB07-51

196.20

214.00

17.80

0.31

 

 

221.00

238.00

17.00

0.64

 

incl

223.10

226.10

3.00

1.76

 

 

246.70

255.20

8.50

2.99

 

incl

246.70

249.00

2.30

10.29

24+00S

KB07-52

5.50

8.50

3.00

1.03

 

 

14.50

19.00

4.50

1.08

 

incl

16.00

19.00

3.00

1.41

 

 

28.00

38.50

10.50

0.55

 

KB07-54

70.00

87.00

17.00

2.05

 

KB07-55

114.30

129.00

14.70

1.01

 

KB07-57

141.90

149.00